News
25.06.12

We were called out to remove vegetation of chimneys at Battersea Power Station and carry out various other maintenance tasks, access proved to be the main challenge - endless ladders and aid climbing on top of that, the surroundings and views straight from a Sci Fi flick - totaly rewarding. Amazing to be on top of those chimneys. More photogrpahs in photo gallery.

 

 

.

24.05.12

With recent hot weather spell there is no time like present to carry out roof repairs and maintenance, it means all work areas can be accessed safely and repairs can be carried out in optimum conditions. Here is our team working on some loose led high above the ground. As led can get very hot it was important to provide adequate PPE and rope protection.

 

13.05.12

Recently our team was involved in tracing and repairing a number of leaks to a newly refurbished flat, this works involved raking out defective pointing, replacing slates , led works, repairs to flashings. All in all nice views.

  

01.05.12

disaster in making

Finaly it is raining, I am sure Thames Water is happy about the recent downpours but we are getting flooded with call outs to leaking roofs, blocked gutters etc, seems that a lot of hard to access roofs and gutters in London is leaking. Back to work then

29.03.12

Click on our works gallery at the bottom of this page and scroll down to see new photogrpahs of recently carried out works

29.03.12

Works on listed tower with cherry picker access, new photogrpah in our works gallery

29.03.12

Our team is doing external cladding survey right opposite Hyde Park - weather cooperates

11.10.11

Shooting abseil scenes for upcoming action film

11.10.11

Night works in Wardour Street

Pages